Wednesday, 23 June 2010
Big Boulder looking awesome!



The big twisted and curved panels were fitted to the Big Boulder last weekend and finally we can see what an impressive shape we've created. The Big Boulder has potential for all grades of problem as well as some route length link ups - we can't wait to climb on it! Meanwhile structural steels & timbers are going up around the pit and it won't be long before this starts getting panelled.
Sunday, 6 June 2010
Big Rock's getting bigger!



We're sorry we haven't updated recently, but things have been happening, as you can see. The pit is now finally formed, and will be left for a little while for the concrete to cure and dry. In the meantime, bouldering walls have been put up all along one side of the unit, including all angles from slightly slabby to worryingly overhanging. Next to that the big, freestanding boulder is also taking shape. The preformed modular wall is quickly going up across the other side of the chasm in the group area. Watch this space to see more bouldering and group areas sprouting up either side of the pit soon.
Saturday, 8 May 2010
Bouldering Wall Construction Starts
Climbers from the Beacon arrived on site at the beginning of the week to start construction of the climbing walls. They'll be here for about two months. The 'north wall' of the bouldering area has been set out, and will shortly be ready to receive the climbing panels that have already been fabricated (in the Beacon's North Wales factory).
In the meantime, the pit is progressing well. The reinforcement arrived during the week, and concrete pouring for the retaining walls and floor will start on Monday.
Thursday, 15 April 2010
Pit Progress
Progress has been good in the Unit these last few days. The concrete floor has been broken up and the serious digging of the Pit has started. Meanwhile, Pete the Builder is rushing to get as much done as possible before he heads off to Nepal in a couple of weeks. The electrics and plumbing are well underway, as are the changing rooms, the office and the cafe kitchen.
Wednesday, 14 April 2010
Meanwhile in the Beacon workshop...